Meyar

Capacity: 100 m3 / day.

Client: Meyar .

Location: Laban – Riyadh.

Project: Reverse osmosis water desalination plant.

مشروع معيار

Brief description

The project includes a reverse osmosis plant for water treatment. The project consisted of the establishment, supply, installation, operation, delivery, guarantee and completion of all works related to the desalination plant, which was operating with a production capacity of 100 m3 / day. The plant was delivered ready for operation and the plant was followed up during the warranty period as required.