Meyar
Meyar Capacity: 100 m3 / day. Client: Meyar . Location: Laban – Riyadh. Project: Reverse osmosis water desalination plant. Brief description The project includes a reverse osmosis plant for water treatment. The project consisted of the establishment, supply, installation, operation, delivery, guarantee and completion of all works related to the desalination plant, which was operating […]
Asel
Asel Capacity: 10 m3 / day. Owner: Aseel Company Limited – Sum Thing Restaurant. Location: Al Takhassusi – Riyadh. Project: Periodic maintenance and follow-up visits to a water desalination plant using reverse osmosis technology. Brief description The project includes carrying out maintenance for the RO, indicating its operational problems and repairing them, then carrying out […]
British schools
British International Schools British International Schools Capacity: 5 m3 / day. Owner: British International Schools. Client: Setup Force. Location: Al Sefarat – Riyadh. Project: Reverse osmosis water desalination plant. Brief description The project includes a reverse osmosis plant for water treatment. The project consisted of constructing, supplying, installing, operating, delivering, guaranteeing and completing all works […]
British International Schools
British International Schools Capacity: 4200 liters/day. Owner: British International Schools. Client: Miz Gulf. Location: Al Sefarat – Riyadh. Project: Water filtration and softening unit system (Softner). Brief description The project contains a filtration unit system, where the supply, operation, and testing of the filtration unit, which contains an automatic softener unit, a multi-layer sand filter, […]
Al Hokair Group
Al Hokair Group Capacity: 300 m3 / day. Owner: Al Hokair Group – Holiday Inn. Location: Olaya – Riyadh. Project: Comprehensive and periodic maintenance of a water desalination plant using reverse osmosis technology. Brief description The project includes the restoration of a reverse osmosis water treatment plant with a production capacity of 300 m3 / […]
Princess Nora University
Princess Noura University Owner: Princess Noura bint Abdulrahman University. Contractor: Zahran Operation and Maintenance. Client: Arab Source. Location: Al-Narjis neighborhood – Riyadh. Project: Defossilizatin of sand and gravel from sand filters on site, filling them after removal and installing a new sand filter. Brief description The project includes the supply of different media layers of […]
AlRedha
AlRahden Capacity: 25 m3 / day. Owner: Al Rahden Factory. Location: Industrial City – Riyadh. Project: Reverse osmosis water desalination plant. Brief description The project includes a reverse osmosis plant for water treatment. The project consisted of constructing, supplying, installing, operating, delivering, guaranteeing and completing all works related to the desalination plant, which was operating […]
The Royal Commission for Al-Ula
The Royal Commission for Al-Ula Capacity: 60 m3 / day. Owner: The Royal Commission for Al-Ula . Client: Tabuk Investment and Tourism Company. Location: Al-Ula – Al-Madinah Al-Munawwarah Region. Project: Periodic maintenance of a reverse osmosis water desalination plant. Brief description The project includes the supply of chemicals, filters, and all electrical, and simple plumbing […]
Sharma
Sharma Capacity: 25 m3 / day. Client: Tabuk Investment and Tourism Company. Location: Sharma – Neom. Project: Maintenance of water desalination plant using RO system. Brief description The project includes maintenance of a RO system. The project was a comprehensive maintenance of a desalination plant, and the plant was restarted with the required operational efficiency.
Princess Adela’s palace
Princess Adela’s palace Capacity: 60 m3 / day. Owner: Princess Adela bint Abdullah Al Saud. Location: Al Takhassusi – Riyadh. Project: Periodic maintenance and follow-up visits to a water desalination plant using reverse osmosis technology. Brief description The project includes the restoration of a reverse osmosis water treatment plant with a production capacity of 60 […]